Phase 12 of the Roadside Mitigation has now completed on the southwest side of the Birdpoint loop, Phase 13 will continue in that area in April of 2024.
For any Roadside Mitigation Phase, cutting will be along ISLA’s easement to clear/trim forestry overhang, to make room for a bigger fire break, to make the adjacent road/easement fire wise compliant and to make the roads less dangerous for citizens and emergency responders.
The slash will be 'chipped in place'. This will consist of moving the chipper down the road and evenly distributing the chips back into the HOA easement alongside the road. The amount of chips produced will not pose any additional wildfire risk and will quickly remove the slash with the least amount of effort. If individual lot owners are concerned about the fire mitigation/chips being put back onto the easement along their property, they can provide a truck/trailer for chips to be collected that would have been distributed along their property line. Those lot owners would also need to be available at the time of the chipping operations to drive their truck/trailer as the chipper moves down the road processing slash. Those interested in collecting wood chips need to contact Darin Anderson at drandersoninc@gmail.com/719-221-9914 within the next 30 days to be notified of the approximate day/time of the roadside mitigation along their property.
The larger pieces of usable wood will be made available for property owners to pick up. First come first serve basis.
Copyright © 2010 ISLA - All Rights Reserved. Site Updated 02-28-2023