• Home
  • Regulations
  • Agenda and Meeting Mins
  • Fire Protection
  • 2024 Dues Proposal
  • Board Terms
  • News Letter
  • Snow Plow Policy
  • BOARD MEMBERS
  • Archives Meeting Minutes
  • Archives Station 3
  • More
    • Home
    • Regulations
    • Agenda and Meeting Mins
    • Fire Protection
    • 2024 Dues Proposal
    • Board Terms
    • News Letter
    • Snow Plow Policy
    • BOARD MEMBERS
    • Archives Meeting Minutes
    • Archives Station 3
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Regulations
  • Agenda and Meeting Mins
  • Fire Protection
  • 2024 Dues Proposal
  • Board Terms
  • News Letter
  • Snow Plow Policy
  • BOARD MEMBERS
  • Archives Meeting Minutes
  • Archives Station 3

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

ISLA Community Wildfire Protection Plan & Mitigation Phases

 The scope of work for this phase consists of (see attached map, areas highlighted in yellow): 


 Phase 11: Continue on SW BirdPoint Dr (around Lot #52) towards HalfMound Dr as far as remaining funds will allow. 

Approximate Dates:

4/3 - 4/14: Cutting Operations

4/21-4/28: Chipping Operations


Cutting will be along ISLA’s easement to clear/trim forestry overhang, to make room for a bigger fire break, to make the adjacent road/easement fire wise compliant and to make the roads less dangerous for citizens and emergency responders. 


The slash will be 'chipped in place'. This will consist of moving the chipper down the road and evenly distributing the chips back into the HOA easement alongside the road. The amount of chips produced will not pose any additional wildfire risk and will quickly remove the slash with the least amount of effort. If individual lot owners are concerned about the fire mitigation/chips being put back onto the easement along their property, they can provide a truck/trailer for chips to be collected that would have been distributed along their property line. Those lot owners would also need to be available at the time of the chipping operations to drive their truck/trailer as the chipper moves down the road processing slash. Those interested in collecting wood chips need to contact Darin Anderson at drandersoninc@gmail.com/719-221-9914 within the next 30 days to be notified of the approximate day/time of the roadside mitigation along their property. 


The larger pieces of usable wood will be made available for property owners to pick up. First come first serve basis.


Mitigation Progress and Plan for 2023 (jpg)Download

Fire Protection & Information

 Deermountain Fire protection 

 dmfpd.net

Fire Side Chat 

dmfiresidechat.com


Fire Mitigation Info

Appendix A-B - Maps 5-9-2016 (pdf)Download
Appendix C - Evacuation Planning Guidelines-a (pdf)Download
Appendix D - Structure Triage (pdf)Download
Appendix E - FireWise (pdf)Download
Appendix F - Fuelbreak Guidelines (pdf)Download
Appendix G - Fuelbreaks & Prescribed Burns (pdf)Download
Appendix H - Road and Driveway Specifications (pdf)Download
Appendix I - Definition of Terms (pdf)Download
Appendix J - Potential Sources of Funding (pdf)Download
Appendix K -_References and Publications (pdf)Download
Appendix L - CO Wildfire Risk Assessment Report_Indian_Springs (pdf)Download
Appendix M - Protecting Your Home from Wildfire - Creating Wildfire Defensible Space Zones (pdf)Download
Appendix N - ALERT FREMONT (pdf)Download
Final CWPP 5-9-2016 (pdf)Download

Copyright © 2010 ISLA - All Rights Reserved.         Site Updated 10-21-2020


Powered by GoDaddy